Cutting supplier costs by 23% without losing a single key relationship.
The challenge
A 45-person precision engineering business in Greater Manchester had grown quickly but its supply chain hadn't kept pace. Supplier relationships were informal, pricing hadn't been reviewed in years, and a single-source dependency on a critical component had nearly caused a production shutdown twice in 18 months.
What we did
We conducted a full supply chain audit over six weeks — mapping every supplier, spend category, and dependency. We ran a structured renegotiation process with the top 12 suppliers by spend, introduced dual-sourcing on the three highest-risk components, and implemented a simple supplier scorecard system that the operations manager could run without external support.
"We knew we were paying too much but didn't have the time or the leverage to do anything about it. Having someone in the room who'd done this before made all the difference."
— Operations Director, Precision Engineering SME